

1.What components are needed to access the internal storage on a BladeCenter S?
A.Optical Pass-Thru Module and one SFF FC adapter per blade
B.One iSCSI adapter per blade
C.SAS Connectivity Module and one SAS expansion card per blade
D.Integrated internal storage adapter
Answer:C
2.A customer using IBM BladeCenter H wants redundant and separate management and production
LANs. Which of the following is required to provide redundant connections to separate LANs within the
BladeCenter?
A.Four Cisco Systems Fibre Intelligent Gigabit Ethernet switch modules
B.Two Cisco Systems Fibre Intelligent Gigabit Ethernet switch modules and a BladeCenter Gigabit SFF
Ethernet expansion card
C.Two IBM Server Connectivity Modules and an Ethernet expansion card CFFv
D.Four BNT/ Nortel Layer 2-7 GbE switch modules and a BladeCenter Gigabit SFF Ethernet expansion
card
Answer:D
3.A customer is installing a Myrinet Cluster Expansion Card in an existing IBM LS21 blade server. Which
bay should the Optical Pass-thru Module be placed?
A.1
B.2
C.3
D.4
Answer:D
4.A prospect has an new Director of IT. They are reviewing all servers to reduce the number of operating
systems in their IT operations. Which operating system is supported on an LS21 blade?
A.Red Hat Enterprise Linux v.4 Update 4 (AS, ES, WS)
B.Red Hat 9
C.Novell Netware 5.2
D.Microsoft Windows 2000 Professional
Answer:A
試験の名称: IBM Blade Center V5
問題と解答: 45 Q&As
更新: 2009-08-18
Killtest試験のIBM certifications II 認証のネットの補佐000-085は最高の標準的な技術に応じて書いて入ります、000-085中すべての重要知識を含み、認定関連例題の分析も加えられました。弊社は最新の000-085試験問題で正しい解答が付け加えています。
すべての試験科目が更新することができる、IBM certifications II 中すべての重要知識を含み。000-085のQ&Aも学ぶなら、000-085すべての知識を更にはっきりと認知できます。認証育成を行っていないでも大丈夫で、一日に一生懸命勉強するだけで、合格ことができる。
お客様が一度目の試験でパスすることを保障いたします。もし、000-085 (IBM Blade Center V5)でパスしなかった、弊社製品のご購入金を全額返済いたします,そして無料にして1部の同等な価値の製品を郵送します。
英語版を提供する。我々の会社は一年で無料更新します。 お客様が一度目の試験でパスすることを保障いたします。もし、000-085でパスしなかった、弊社製品のご購入金を全額返済いたします それは一回で000-085試験を通過ことを確保の道です。